Ottery St Mary

ON SITE | 4nr APARTMENTS

Novo Timber were appointed to provide the full timber frame package for this residential project in East Devon, from detailed design and manufacture through to supply and erection on site.

A hybrid panel specification was selected to balance buildability, programme and thermal performance. This approach utilised factory-fitted PIR insulation within an open panel system, allowing key elements to be installed under controlled factory conditions, while retaining flexibility on site.

The panels were then completed with a secondary layer of PIR installed on site, enabling the design team to fine-tune the overall U-value and airtightness strategy in line with the project’s energy performance targets.

Early coordination with the client team and other trades helped streamline interfaces, reduce on-site risk, and maintain programme certainty, particularly around service routes and detailing at junctions.

services provided

Timber Frame Design and Engineering

Hybrid Panel Insulation (factory fitted PIR)

Full-Frame Erection Service

project team

Main Contractor: South West Heritage and Design

Engineering: Paramount Structures

Timber Frame Design: Knight Designs

Architects: New Space Architects

Contract Administration: Savills